Traffic Service Tirol & Austria
Current traffic situation & important messages!
Traffic News
Get the latest traffic news for Austria here and plan a stree-free journey to the adventure region of the Tyrolean Oberland.
You can always find the most important updated traffic reports in the traffic news below.
Important Road Information B180 Reschenstraße
from 05.08.2026
Daily Closures
As part of the construction of the Pulpit Gallery, daily closures will be necessary for rock removal work following the freeze-thaw cycle in the spring and for road construction as well as the stabilization of a rock outcrop near the new gallery in the fall, as follows:
- 31.08.2026 bis 27.11.2026: Daily closures Monday through Thursday from 7:30 a.m. to 6:00 p.m. and Friday from 7:30 a.m. to 2:00 p.m.
During the daily closures, the following details must be observed:
- The closures apply from Pfunds/Kajetan Bridge (B 184 Engadiner Straße junction) to Nauders/B 185 Martinsbrucker Straße junction; however, access to Nauders via the B 180 Reschenstraße remains unrestricted.
- Traffic will be diverted—with the exception of vehicles with trailers longer than 6.5 meters and buses longer than 13 meters—via the B 185 Martinsbrucker Straße, the H 27 Engadiner Straße (Swiss territory), and the B 184 Engadiner Straße.
- Vehicles that cannot use the B 185 Martinsbrucker Straße due to existing traffic restrictions must take a wide detour around the closure or wait for the designated passage time slots.
- Outside the specified closure times, traffic may proceed through the construction zone in a single lane (traffic light control).
- Swiss Customs has announced that there are no exceptions regarding the heavy vehicle toll for vehicles over 3.5 tons.
Important information for cyclists:
- Outside of the daytime closures
Cyclists can use the Via Claudia Augusta as usual from Pfunds to Martina, continuing over the Norbertshöhe to Nauders and on to the Reschen Pass. - During daytime closures
Bicycles are prohibited on the B 185 Martinsbruckerstraße from Martinsbruck to Norbertshöhe uphill during daytime closures. Bicycle traffic is rerouted via the forest road (note: not suitable for road bikes) Altfinstermünz “Bierweg”.
There is a continuous ban on bicycles on the B 180 Reschenstraße from the Kajetansbrücke/Pfunds to the junction with the Bierweg (Altfinstermünz access road).
The Inn Cycle Path is passable without restrictions in summer 2026.
Important Road Information L348 Spisser Straße
from 21.08.2026
Road Closure Between Spissermühle and Kajetansbrücke
Due to construction work, Spisserstraße will be closed on several days between Spissermühle and Kajetansbrücke.
The road will be closed from 8:00 a.m. to 6:00 p.m. each day. A detour is posted.
Closure times:
- Monday, August 31 - Closure from 8:00 a.m. to 12:00 p.m. & 1:00 p.m. to 6:00 p.m.
- Tuesday, September 1 - Closure from 8:00 a.m. to 12:00 p.m. & 1:00 p.m. to 6:00 p.m.
- Wednesday, September 2 - Road closure from 8:00 a.m. to 6:00 p.m.
- Thursday, September 3 - One-way closure from 7:00 a.m. to 6:00 p.m.
- Friday, September 4 – one-way closure from 7:00 a.m. to 6:00 p.m.
- Monday, September 7 – closure from 8:00 a.m. to 6:00 p.m.
- Tuesday, September 8 - Road closure from 8:00 a.m. to 12:00 p.m. & 1:00 p.m. to 6:00 p.m.
- Wednesday, September 9 - Road closure from 8:00 a.m. to 7:00/8:00 p.m.
- Thursday, September 10 - Road closure or one-way closure from 8:00 a.m. to 7:00 p.m./8:00 p.m.
- Friday, September 11 - One-way closure
- September 14 – September 16, 2026 - As needed - Road closure or one-way closure